menuMobile Logo
shopping_cart
7 Results
filter_altFilter
sort

ESP Power Cables

Centriline ESP Power Cables
Part #CESP
Lead time:12-16 weeks

Delivering reliable power to ESP systems in the harshest downhole environments

PER 78 INCH STEEL REEL, HEAVY DUTY UTILIZED
Part #C70278H
Lead time:12 Weeks

Cable Reel in-order for ESP cable to be delivered

Copper Adder - #2 Flat Cable
Part #10398027

This is material charge of copper added in #2 flat cable. This item must be ordered together with #2 flat cable.

Copper Adder - #4 Flat Cable
Part #10398028

This is material charge of copper added in #4 flat cable. This item must be ordered together with #4 flat cable.

Lead Adder - #4 Flat Cable
Part #10603148

This is material charge of lead added in #4 flat cable. This item must be ordered together with #4 flat cable.

Lead Adder - #2 Flat Cable
Part #10603146

This is material charge of lead added in #2 flat cable. This item must be ordered together with #2 flat cable.

Copper Commodity Adder
Part #10210685

This is material charge of copper added per foot of cable.